The government naturally cannot afford it, and new plans have been introduced in all aspects. In the detailed rules, Beijing, Tianjin and Hebei are undoubtedly listed as key areas and must be monitored with priority.
In fact, compared with the 100-850mg limit in developed countries, 1200-2100 still seems very loose, but this is a big span for us.
What Zhang Yifu knew was that more than ten years later, in the standard version of 2011, this number was mostly limited to 100mg, and then even proposed the concept of zero emissions, which was the pursuit of excellence.
But Rome is not built in one day, and emissions cannot be reduced in one day. 1200-2100mg, which is definitely a hurdle for thermal power. Monitoring and management in other places may be a little loose, but Beijing-Tianjin-Hebei is really imminent. The Environmental Protection Bureau has made it clear that they will carry out continuous and high-density monitoring of power plants in this range. If it doesn’t work, you can stop production! If the power supply is stopped, there will be problems! If there is a problem with the power supply, Huang Zhenghui will explode! Huang Zhenghui will not allow himself to explode, so the entire Beijing-Tianjin-Hebei region will take action immediately.
This trend has existed long ago, not only Constant Electric, but only Zhang Yifu saw it. However, most other companies have lower technical targets and are mostly working on drainage systems. After all, they are solved through chemical preparations and pipelines, and the technical difficulty is lower. Some people are working on smoke and dust. However, the intensity is not as strong as Constant Electric, and the degree of automation and methods are simpler. It is an upgraded version based on tradition, improving limited results.
On the Hengdian side, Chang Siping and others spent more than a year and worked hard. In addition, they introduced the flue gas treatment and monitoring system made by German components, so they really hit this point!
Almost at the same time as the quality certification of the continuum equipment was approved, gb132-1996 also announced that all new power plants and expansion units must meet the new standards.
The planned power plants, including the power plants that have been planned to start construction in 1997, have to face this serious problem. There are not many domestic companies that engage in desulfurization, denitrification, dust and smoke exhaust, but the methods, technology, and automation are all in a very basic stage. Everything will be fine if you can meet the standards of 1991. After all, the cost of flue gas treatment is very large, not just one-time installation costs, but the consumption of electricity used by the factory after production, the cost of chemical preparations and other consumables. The higher the efficiency you want, the cost will almost double.
In this emergency situation, the first thing that comes to mind is import plans, outsourcing the smoke treatment. Although the bidding is time-consuming and labor-intensive, it is always better than being killed if it fails to meet the standards. At this moment, Hengdian took out a bunch of certifications.
In the certification of authoritative institutions, the desulfurization efficiency of edr reaches 98%. Of course, this is the data under certain conditions, based on various objective parameters. In fact, the desulfurization efficiency is stable to float between 92% and 98%, which is enough.
Later, when people evaluated Hengdian products, they often had an indescribable embarrassment: we also wanted to bid, but there was really no second domestic manufacturer that was able to bid, so they had to specify the purchase.
If in the relay protection industry, if the microcomputer cannot be suppressed and can still be maintained with traditional protection equipment, the emission standards this time are really a resolute thing, at least the new power plants and units need to increase the budget for this.
But that's still the same problem. No matter how banned the various documents, this is also a blank product in China. There is no precedent for use in China. It's like a confident graduate. No matter how powerful you are, you have no experience. You are in a hurry to work and won't miss you. Generally speaking, the first job is really inevitable.
Hengdian Environmental Protection Equipment Company, the first benefit of falling into northern Hebei has finally emerged, and it has a close connection with North China Bureau, Jibei Power Plant and Beimo Company. Finally, the process is completed. Unit No. 3 of Jibei Power Plant is a unit expanded in period 2. During the self-inspection process, smoke and dust slightly exceeded the standard, and the out-of-stocking basically met the standard, and the sulfide seriously exceeded the standard, which is a long way from the new standard in period 2. However, this situation is very common. Environmental protection cannot force you to stop production, that is, turn a blind eye and catch a new power plant tighter, but in time, this problem must be solved.
It coincided with the trough of electricity consumption in the year. Taking advantage of the shutdown at the end of the year, Hengdian won this opportunity. The denitrification system remained unchanged and only involved two major parts: dust removal and desulfurization. It also adopted a low-key and stable attitude in the quotation. The final quotation was almost profitable. Although the normal quotation in Hengdian's plan was about twice that of this number, the most lacking thing is still recognition.
The elites of Hengdian Engineering and Hengdian Environmental Protection were also transferred to northern Hebei to focus on this transformation project.
Zhang Yifu also personally stationed in northern Hebei to ensure that the project is completed on schedule.
Zhao Hongqi is undoubtedly the one who is most moved. When he first came to the Jibei Power Plant a few years ago, he still carried a shovel to bury the ground with lightning protection. Now he has transformed himself into the person in charge of the power plant renovation project. The equipment is ready-made. His task is to complete the renovation before the Spring Festival, which was guaranteed to Lin Lizheng, the top leader of Beimo Company.
Hengdian has indeed adhered to its consistent style. Engineering design is ahead and only enters the power plant after formulating a complete construction plan. Before shutting down, all equipment, auxiliary materials, tools and equipment are in place first. This project is also a high concentration and training of many capabilities such as production, manufacturing, logistics, engineering design, and construction. The project plan is accurate to every day.
Among the two major systems of dust removal and desulfurization, it is further divided into flue gas, compressed air, ash transport, desulfurizer slurry preparation, by-products, water circulation and other systems. It also involves precise pipeline design. It must be proficient in power plant design and equipment use, and the test is extremely comprehensive and meticulous ability.
This is the first time Chang Siping can fully play it out.
From economizers to pipelines, to desulfurization and dust removal equipment, he has been working on auxiliary equipment over the years, and it really feels like slaughtering a knives. When he comes to a familiar power plant, he takes the construction drawings and designs research plans one by one. Can this be a professional?
It is worth mentioning that during this construction, Duan Youwei, an old expert who retired at home, was invited to serve as a consultant. Duan is undoubtedly the person who is most familiar with the Jibei Power Plant, and he is also the person who knows the priorities of the matter. With him, at least there will be no mistakes, safety first.